Made from robust expanded polypropylene and consist of modular sections which are combined to encase a range of headers, including our Low Loss and Magnetic Low Loss Headers.
Header Kits And Low Loss Headers Can Be Insulated Using Our Robust Expanded Polypropylene Modular Insulation Range.
The Number Of Boilers In Your Cascade Will Determine The Type And Number Of Kits Required.
1 Kit Required Per Pump.
2 years parts and labour from date of installation/commissioning.
Extend to 5 years - when commissioned by an Ideal Heating Engineer, serviced annually by a Gas Safe registered engineer who has completed training with Ideal Heating.
Ts&Cs for 2yr warranty - Register boiler within 30 days of completed installation or warranty defaults to 12 months. Commissioning must take place within 12 months of boiler manufacture. If no completed commissioning provided, warranty will commence from manufacture date on data plate. https://idealcommercialboilers.com/uploads/documents/Ideal-Heating-Commercial-Wall-Hung-Boiler-Warranty-Terms-and-Conditions.pdf
Technical specification
Waist Sizeab22ch57fxToilet Cistern CapacityFTW--ERP RatingNot ApplicableSupplier Part Number222894Range DescriptionEVOMAX 2 FR/HDR MLLH PUMP INSULATION 222894Manufacturer Model No222894Brand NameIdeal